Ares I First Stage Test Set For August 25th (Video)

The completed Ares I first stage five-segment solid rocket booster in Promontory, Utah on July 21st (NASA/ATK/RedOrbit)
The completed Ares I first stage five-segment solid rocket booster in Promontory, Utah on July 21st (NASA/ATK/RedOrbit)

Development of the Constellation Program pushes ahead with the announcement that the first stage motor of the Ares I crew launch vehicle will be fired in the Utah desert on August 25th. The Ares I five-segment first stage booster is based on the design of the shuttle’s four-segment booster, but it will deliver a far meatier 3.6 million pounds of thrust. A single shuttle booster delivers 2.8 million pounds of thrust (but remember, there are two of them attached to the shuttle at lift-off).

Naturally, the ATK/NASA Utah test will be a huge event, a major milestone towards the construction and assembly of the rocket that will carry the Orion spaceship into orbit. This is in addition to the continuing developments of Orion.

So, to promote the event ATK has released this snazzy movie-style trailer ahead of this historic rocket test, and to be honest, I’m impressed:

Although Constellation is hitting wave upon wave of setbacks and criticism, it seems the tests are pushing ahead, and we are beginning to see the physical embodiment of the Ares I/Orion combo take shape.

Source: Fox Business

One thought on “Ares I First Stage Test Set For August 25th (Video)”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: